TOTAL AREA |
CLOSED AREA |
BUS WASH |
PURIFICATION PLANT |
FUEL |
REPAIR CHANNELS |
41.742 m² |
2.585 m² |
1 |
1 |
3 Diesel Tank |
6 Repair Units |
The workshop at the facility contains two fuel dispensing and lubrication lines, four repair lines and a separate section for body defects, electricity failures etc. in addition to such lines.
In fuel dispersing and lubrication lines, the oil of the buses are replaced and the waste oil are transferred through a special pipeline and stored in a tank buried in the ground located outside of the workshop. The waste oil is collected and offered for sale by being carried with tanker trucks without causing any damage to the environment.
Over the fuel dispensing line, there are two state-of-the-art fuel delivery pumps with 2 nozzles on each. These pumps are connected to three 20-ton tanks specially protected in a concrete basin under the ground outside of the workshop through pipes.
All the repairs and maintenance of the buses belonging to the workshop except heavy maintenance are carried out in the repair lines.
The 192 meter-deep well bored in the premises meets the water need of the workshop.